Orange County
ADU Construction in Orange County
Detached, attached and garage-conversion ADUs — designed, permitted and built as rental units, guest suites or multigenerational living space.
ADU Construction
A second unit, built right
California's ADU laws have made it significantly easier to add a second unit to a single-family lot, whether that's for rental income, a guest suite, a home office or space for aging parents. Most cities are required to process compliant ADU permits ministerially, without a discretionary hearing — but the plans still have to meet building code and site-specific requirements to move quickly.
Because design, permitting and construction run through one team, zoning and utility questions — setbacks, parking replacement, separate metering — get resolved during feasibility review, not after plans are already submitted.
What an ADU Project Can Include
Feasibility through final walkthrough
- Feasibility and zoning review
- Detached new-construction ADUs
- Attached ADUs
- Garage conversions
- Utility connections and separate metering where applicable
- Full kitchen and bathroom build-out
- Permitting under California ADU law and city-specific requirements
- Interior finish selection
From Our Portfolio
Featured Work
Design-Build ADU Construction
One team, from feasibility to final inspection
ADU rules — size limits, parking replacement, setback requirements — vary by city even though they're all built on the same state law framework. Our team confirms what's actually allowed on your lot before design work goes very far, so you're not redesigning after plan check.
Utility connections are often the detail that determines an ADU's timeline: whether it can share a water or electrical connection with the main house, or needs its own. We work through that during planning so construction isn't held up waiting on a utility decision.
Frequently Asked Questions
What Homeowners Ask
How big can an ADU be in Orange County?
Size limits vary by city and lot, but California law generally allows detached ADUs up to 1,200 square feet. We'll confirm the applicable limit for your specific property during a feasibility review.
Do I need a permit for an ADU?
Yes. Most cities process compliant ADU permits ministerially, without a discretionary hearing, under state law — but plans still need to meet building code and site-specific requirements.
Can I convert my garage into an ADU?
In many cases, yes. Garage conversions are one of the most common and cost-effective ADU types, though parking replacement rules vary by city.
How long does ADU construction take?
A typical ADU project runs several months from permitting through construction, depending on size, utility connections and city plan-check timelines.
Related
Explore More
Ready to talk about your ADU?
Schedule a complimentary consultation and we'll walk through feasibility, permitting steps and real costs for your ADU.
