Opening up a closed floor plan means moving structure, not just finishes. That work is engineered and permitted before a wall comes down.
Structural Remodeling
The work behind an open floor plan
Most requests to "open things up" involve a load-bearing wall, which means structural engineering, a permit, and a plan for how the load gets redistributed — a beam, a post, a relocated support. That work has to happen before demolition, not during it.
Because our design and construction teams work from the same plan, structural questions get resolved during design: what can move, what it costs, and how it affects the rest of the layout.
What Structural Remodeling Can Involve
Engineering-driven layout changes
- Load-bearing wall removal or relocation
- Floor-plan reconfiguration
- Engineering coordination and calculations
- Permit-required structural work
- Opening closed floor plans into connected living spaces
- Ceiling and roofline adjustments where structure changes
From Our Portfolio
Featured Work
Frequently Asked Questions
What Homeowners Ask
Do I need a permit to remove a wall?
If it's load-bearing, yes — and even non-load-bearing walls often require a permit depending on what's inside them (electrical, plumbing, HVAC). We handle that determination and the permitting process as part of planning.
How do you know if a wall is load-bearing?
Our team evaluates the home's structure during design, working with a structural engineer where calculations are required, before any demolition pricing or scheduling is finalized.
Does structural work add significant time to a project?
It adds engineering and permitting time up front, which is why we resolve those questions during planning rather than discovering them once construction has started.
Related
Explore More
Thinking about opening up your floor plan?
Schedule a complimentary consultation and we'll help you understand what's structurally possible in your home.